Considerations To Know About CPSR
Observe the position of each buy buy even though capturing, categorizing, and matching to corresponding invoices and shipping receipts.(e) If the Contractor gets the Contracting Officer’s final dedication of material weaknesses, the Contractor shall, within just 45 times of receipt of the final dedication, possibly suitable the material weaknesse